CASE STUDY

NEW ERA SHEFFIELD
PHASE 2

This project was part of a major mixed-use new-build development. The second phase comprised two blocks of student accomodation sitting on the south edge of a new public square formed from the new stopped up Boston Street and provides commercial, restaurant and business premises as well as 182 student rooms and a basement car park.

CLIENT: BOWMER + KIRKLAND

VALUE:

£2.9M

LOCATION:

SHEFFIELD

CONTRACT PERIOD:

10 MONTHS

CONTRACT TYPE:

JCT DESIGN AND BUILD

logo
CASE
STUDY

NEW ERA SHEFFIELD
PHASE 2

NEW ERA SHEFFIELD PHASE 2

BACKGROUND

This project was part of a major mixed-use new-build development. The second phase comprised two blocks of student accomodation sitting on the south edge of a new public square formed from the new stopped up Boston Street and provides commercial, restaurant and business premises as well as 182 student rooms and a basement car park.

Howard Civil Engineering was awarded the basement construction which included the pile caps, capping beam and groundbeams as well as the perimeter wall and base and ground floor slabs of the basement car park.

gray-bg

SCOPE OF WORK

Cropping

Cropping 402 600mm diameter piles

Reinforced concrete

883m³ reinforced concrete in pilecaps and capping beams

Basement slab

2,900m² 350mm thick basement slab

Upstand walls

60m³ reinforced concrete in perimeter upstand walls

Basement retainer walls

350m³ reinforeced concrete in basement retainer walls