The Arla Mega Dairy in Aylesbury represents Howard Civil Engineering’s largest contract to date. The £150m project provided one billion litres of dairy in its first year and produced the worlds first zero-carbon milk. The site, which covers 70 acres, now provides over 700 production, distribution and administration posts, processing milk from over 900 farmers.

CLIENT: CADDICK CONSTRUCTION

VALUE:

£10.9M

LOCATION:

AYLESBURY

CONTRACT PERIOD:

66 WEEKS

CONTRACT TYPE:

JCT

logo
CASE
STUDY

ARLA MEGA
DAIRY

ARLA MEGA DAIRY

BACKGROUND

The Arla Mega Dairy in Aylesbury represents Howard Civil Engineering’s largest contract to date. The £150m project provided one billion litres of dairy in its first year and produced the worlds first zero-carbon milk. The site, which covers 70 acres, now provides over 700 production, distribution and administration posts, processing milk from over 900 farmers.

Howard Civil Engineering was appointed due to our experience in the manufacturing sector and our ability to work to challenging timeframes and completing projects on time and on budget. The site location pushed our limits with regards to distance from our head office in Leeds, but proved the ability of our management team in the successfully delivery of this flagship contract.

Through successful partnering workshops with our client, we made allowance for co-ordinating the installation of our works with those others on site, working closely with other subcontractors to the main contract carrying out works such as structural steel work, composite cladding, external walls and roofing, curtain walling, tarmacadam works and electrical, mechanical and process equipment installation. Adhering to the tight handover dates ensured the scheme was delivered to programme.

gray-bg

SCOPE OF WORK

Extensive network

Drainage, surface, foul and effluen

Ground floor

968m³ reinforced concrete slab

Extensive use

Stainless steel and chemically resistant products

Pond

Large scale lined attenuation

Ground conditions

Extensive external re-engineering

Ground beams, pile caps and lift pits

External and ground floor

Reinforced concrete slabs