CASE STUDY
LEEDS GRAMMAR SCHOOL
Due to the merger of Leeds Grammar School with Leeds Girls High, it was decided to significantly extend the existing Leeds Grammar School site in Alwoodley to facilitate both boys and girls.
CLIENT: HBG CONSTRUCTION
VALUE:
£2.6M
LOCATION:
LEEDS
CONTRACT PERIOD:
60 WEEKS
CONTRACT TYPE:
BESPOKE
LEEDS GRAMMAR SCHOOL
BACKGROUND
Due to the merger of Leeds Grammar School with Leeds Girls High, it was decided to significantly extend the existing Leeds Grammar School site in Alwoodley to facilitate both boys and girls. This entailed a £26m development of the campus which was awarded to HBG Construction (now BAM) through a two-stage tender process.
As part of the project, Howard Civil Engineering was invited to tender the significant revamping and extension to campus infrastructure.
Through our sector knowledge, were able to demonstrate professionalism in working within a live school environment while providing innovative value engineering solutions.