CASE STUDY

CLIFFORD GARDENS

Clifford Gardens is Bellway Homes’ new development of 118 2–5-bedroom family homes in Skipton.

CLIENT: BELLWAY HOMES

VALUE:

£6.3M

LOCATION:

SKIPTON

CONTRACT PERIOD:

24 MONTHS

CONTRACT TYPE:

logo
CASE
STUDY

CLIFFORD GARDENS

CLIFFORD GARDENS

BACKGROUND

Clifford Gardens is Bellway Homes’ new development of 118 2–5-bedroom family homes in Skipton.

Situated on the new Wyvern Park development which aims to regenerate a formerly neglected area of Skipton, Clifford Gardens is hoping to launch new homes for sale in spring 2022.

Howard Civil Engineering has been awarded a £6.3m contract by our new client, Bellway Homes, to deliver the plot works on this highly anticipated development including groundworks, drainage, and highways.

The site contains lots of highly contaminated material, and as such we have already been working alongside various contractors to offer an economical and environmentally friendly resolution to these hurdles including the management of contaminated materials and the installation of protective gas protection measures.

gray-bg

SCOPE OF WORK

Highways

Delivery of the section 38 highways for adoption by North Yorkshire County Council

Surface water and foul water drainage

Installation of section 104 surface water and foul water drainage which includes:

Drainage

Over of 2km of drains and over 100 chambers

Multiple connections

Multiple connections to existing Yorkshire Water apparatus under a section 106 which involves working within the live highway

Management of contaminated

Management of contaminated and unsuitable material ensuring it remains fit for purpose and can be reused within our works.

Groundworks

Groundworks including foundations, private drainage, masonry to damp proof course, floor slabs, and external works to 118 dwellings

Gas protection measures

Due to the former use of the site, installation of robust gas protection measures (Amber 2) to dwellings

TRUST US TO DELIVER YOUR PROJECT ON TIME AND ON BUDGET