CASE STUDY

COGDEN BECK

Cogden Beck was our first contract for North Yorkshire County Council and comprised the reconstruction of two collapsed bridges. The bridges collapsed in 2019 as a result of flooding and our client was granted a £3m funding award to repair the damages.

CLIENT: WILLMOTT DIXON

VALUE:

£2.25M

LOCATION:

ROTHERHAM

CONTRACT PERIOD:

63 WEEKS

CONTRACT TYPE:

BESPOKE

logo
CASE
STUDY

COGDEN BECK

COGDEN BECK

BACKGROUND

Cogden Beck was our first contract for North Yorkshire County Council and comprised the reconstruction of two collapsed bridges. The bridges collapsed in 2019 as a result of flooding and our client was granted a £3m funding award to repair the damages.

This site was a Site of Specific Scientific Interest and, as a result, it was essential that the reconstruction was completed in a very short time period. Howard Civil Engineering was awarded the project in August 2020 and significant emphasis was placed on our ability to react and mobilise very quickly in order to meet the challenging deadlines.

gray-bg

SCOPE OF WORK

One bridge to be constructed

One bridge to be constructed using a box culvert and faced with stone work salvaged from the original collapsed bridge.

Other bridge to be constructed

Other bridge to be constructed using a mixture of new and salvaged stone elements to form the bridge abutments and arched barrel, in addition to in situ concrete support works.

Removal of temporary road surface

Removal of temporary road surface previously installed.

Reinstate surrounding area

Reinstate surrounding area to its natural state.