CASE STUDY

TK MAXX DISTRIBUTION CENTRE

Howard Civil Engineering is proud to have completed works in this new £100m development which is now home to the new TK Maxx distribution facility, providing more than 1.2m sq ft of accommodation. The building was completed in 2017 and supports up to 1,800 jobs.

CLIENT: CADDICK CONSTRUCTION

VALUE:

£3.6M

LOCATION:

KNOTTINGLEY

CONTRACT PERIOD:

12 MONTHS

CONTRACT TYPE:

BESPOKE

logo
CASE
STUDY

TK MAXX
DISTRIBUTION CENTRE

TK MAXX DISTRIBUTION CENTRE

BACKGROUND

Howard Civil Engineering is proud to have completed works in this new £100m development which is now home to the new TK Maxx distribution facility, providing more than 1.2m sq ft of accommodation. The building was completed in 2017 and supports up to 1,800 jobs.

gray-bg

SCOPE OF WORK

Foundations

Reinforced concrete foundations including pile caps and ground beams (3,600m³)

Reinforced concrete foundations

Reinforced concrete foundations and floor slabs for ancillary buildings

Culvert underground walkways

2 in situ box culvert underground walkways 19m and 29m respectively

Kerbs

5,500m kerbs

Drainage

3,200m drainage 225mm dia to 1050mm dia and associated attenuation tank

ACO channel drain

Over 1,000m ACO channel drain

Service trenches

6,000m service trenches to cover the provision of utilities

Access road

500m access road and associated highway works

Street furniture package

Extensive street furniture package