CASE STUDY

WILBERFOSS

Persimmon Homes’ development in Wilberfoss comprised a selection of two, three and four bedroom homes. This was our first project for Persimmon Homes, installing the sewers and main carriageways for this new development of 44 plots.

CLIENT: PERSIMMON HOMES

VALUE:

£0.75M

LOCATION:

WILBERFOSS

CONTRACT PERIOD:

15 WEEKS

CONTRACT TYPE:

BESPOKE

logo
CASE
STUDY

WILBERFOSS

WILBERFOSS

BACKGROUND

Persimmon Homes’ development in Wilberfoss comprised a selection of two, three and four bedroom homes.

This was our first project for Persimmon Homes, installing the sewers and main carriageways for this new development of 44 plots.

A high water table and running sands were overcome through the installation of a dewatering system to progress the works.

Through proactively overcoming the unforeseen ground conditions, we were able to keep the affect of the poor ground conditions on the programme to a minimum.

gray-bg

SCOPE OF WORK

Provision

200m haul road across adjacent field

Pipe

190m 1500mm dia SW attenuation

Extensive use

Stainless steel and chemically resistant products

Foul, surface water and rising main

Pumping station

Foul and surface water

Connection

Connection to existing foul in highway

Carriageway

700m2 carriageway surfacing up to binder course

Installation

Topsoil strip and installation of piling mat