Persimmon Homes’ development in Wilberfoss comprised a selection of two, three and four bedroom homes. This was our first project for Persimmon Homes, installing the sewers and main carriageways for this new development of 44 plots.

CLIENT: PERSIMMON HOMES
VALUE:
ÂŁ0.75M
LOCATION:
WILBERFOSS
CONTRACT PERIOD:
15 WEEKS
CONTRACT TYPE:
BESPOKE

STUDY
WILBERFOSS
WILBERFOSS
BACKGROUND
Persimmon Homes’ development in Wilberfoss comprised a selection of two, three and four bedroom homes.
This was our first project for Persimmon Homes, installing the sewers and main carriageways for this new development of 44 plots.
A high water table and running sands were overcome through the installation of a dewatering system to progress the works.
Through proactively overcoming the unforeseen ground conditions, we were able to keep the affect of the poor ground conditions on the programme to a minimum.

SCOPE OF WORK
Provision
200m haul road across adjacent field
Pipe
190m 1500mm dia SW attenuation
Extensive use
Stainless steel and chemically resistant products
Foul, surface water and rising main
Pumping station
Foul and surface water
Connection
Connection to existing foul in highway
Carriageway
700m2 carriageway surfacing up to binder course
Installation
Topsoil strip and installation of piling mat
VIDEO