Now complete, Victoria Gate houses a flagship 21,000m² John Lewis store alongside an elegantly designed two-street arcade with 30 stores, restaurants, cafes, and a casino. A multi-storey car park also provides spaces for up to 800 cars.

CLIENT: BAM CONSTRUCTION

VALUE:

£1.8M

LOCATION:

HULL

CONTRACT PERIOD:

58 WEEKS

CONTRACT TYPE:

NEC3 SUBCONTRACT
OPTION A

logo
CASE
STUDY

VICTORIA
GATE

VICTORIA GATE

BACKGROUND

Now complete, Victoria Gate houses a flagship 21,000m² John Lewis store alongside an elegantly designed two-street arcade with 30 stores, restaurants, cafes, and a casino. A multi-storey car park also provides spaces for up to 800 cars.

Howard Civil Engineering was awarded the drainage, substructure and superstructure civil engineering works. Key constraints in the development of this city-centre site were its proximity to local businesses, working alongside other contractors, and utilising every square metre of developable footprint of the site. The programming and sequencing of the various phases was been paramount.

gray-bg

SCOPE OF WORK

Excavation

Excavation to expose piles and contiguous piled walls (7,000m³)

Reinforced concrete foundations

Reinforced concrete foundations including pile caps and ground beams (2,000m³)

Reinforced concrete structures

Reinforced concrete structures including 5 cores up to 6 storeys high with climbing formwork (800m³)

Reinforced concrete basement structure

Reinforced concrete basement structure with reinforced concrete walls (single and two-sided)

Extensive temporary works scheme

Extensive temporary works scheme to support a contiguous piled wall and capping beam

Suspended reinforced concrete

Suspended reinforced concrete soffit works

Insitu concrete ground

Insitu concrete ground and upper floor slabs (4,800m³)

Rebar and mesh

750 tonnes rebar, 18,000m² mesh

Drainage

Drainage including Section 104 outfall works within the highway, cast iron products, pumping station, attenuation tanks

Services

Services to cover the provision of utilities to the individual retail units