CASE STUDY
UNIVERSITY CENTRE ROTHERHAM
University Centre Rotherham’s new campus has brought a wealth of education and training opportunities to the region, building upon learning provider’s existing range of degrees, higher-level courses and professional training.

CLIENT: WILLMOTT DIXON
VALUE:
£0.5M
LOCATION:
ROTHERHAM
CONTRACT PERIOD:
CONTRACT TYPE:
BESPOKE

STUDY
UNIVERSITY CENTRE
ROTHERHAM
UNIVERSITY CENTRE ROTHERHAM
BACKGROUND
University Centre Rotherham’s new campus has brought a wealth of education and training opportunities to the region, building upon learning provider’s existing range of degrees, higher-level courses and professional training. The campus offers a dedicated facility for university students with specialist teaching, study and exhibition spaces, a library, café and social areas.
Howard Civil Engineering commenced with an enabling package followed by the groundworks for this scheme in September 2017.

SCOPE OF WORK
Drainage
Enabling package drainage diversion and site access works
Foundations
Pad foundations and ground beams
Pits
Lift pits
Ground floor slabs
Ground floor slabs
Upper floor slabs
Upper floor slabs
External works
External works
Foul
Foul and surface water drainage
Fire fighting
Fire fighting main installation
Video
FEATURED CASE STUDIES


TRUST US TO DELIVER YOUR PROJECT ON TIME AND ON BUDGET