CASE STUDY
TK MAXX DISTRIBUTION CENTRE
Howard Civil Engineering is proud to have completed works in this new £100m development which is now home to the new TK Maxx distribution facility, providing more than 1.2m sq ft of accommodation. The building was completed in 2017 and supports up to 1,800 jobs.

CLIENT: CADDICK CONSTRUCTION
VALUE:
£3.6M
LOCATION:
KNOTTINGLEY
CONTRACT PERIOD:
12 MONTHS
CONTRACT TYPE:
BESPOKE

STUDY
TK MAXX
DISTRIBUTION CENTRE
TK MAXX DISTRIBUTION CENTRE
BACKGROUND
Howard Civil Engineering is proud to have completed works in this new £100m development which is now home to the new TK Maxx distribution facility, providing more than 1.2m sq ft of accommodation. The building was completed in 2017 and supports up to 1,800 jobs.

SCOPE OF WORK
Foundations
Reinforced concrete foundations including pile caps and ground beams (3,600m³)
Reinforced concrete foundations
Reinforced concrete foundations and floor slabs for ancillary buildings
Culvert underground walkways
2 in situ box culvert underground walkways 19m and 29m respectively
Kerbs
5,500m kerbs
Drainage
3,200m drainage 225mm dia to 1050mm dia and associated attenuation tank
ACO channel drain
Over 1,000m ACO channel drain
Service trenches
6,000m service trenches to cover the provision of utilities
Access road
500m access road and associated highway works
Street furniture package
Extensive street furniture package