BACKGROUND

Marshall Construction commenced works to a new 4* hotel in the centre of Manchester in early 2017.

The site was located in the centre of Manchester with the main frontage facing on to Portland Street. The property is bounded by highways on three sides, with the existing office building situated along the Eastern site boundary. Access to the site was strictly controlled by an agreed Traffic Management Strategy.

gray-bg

SCOPE OF WORK

Pile caps

35no from 2.5m3 – 15m3

Pile cap for tower crane

25m3

Contiguous piled wall facing

550m2 and capping beam 120m to top of contig piles

Associated tanking and damp proofing

Retaining walls

Basement slab

1,100m2

Lift pit

Foul drainage

Constrained city centre site