CASE STUDY

OAK BECK BRIDGE

Following the successful delivery of work to repair and reconstruct bridges along Cogden Beck for North Yorkshire County Council, Howard Civil Engineering has been awarded a £1m contract to demolish and reconstruct a bridge over Oak Beck which forms part of the A59 in Harrogate.

CLIENT: NORTH YORKSHIRE COUNTY COUNCIL

VALUE:

£1M

LOCATION:

HARROGATE

CONTRACT PERIOD:

24 WEEKS

CONTRACT TYPE:

logo
CASE
STUDY

OAK BECK BRIDGE

OAK BECK BRIDGE

BACKGROUND

Following the successful delivery of work to repair and reconstruct bridges along Cogden Beck for North Yorkshire County Council, Howard Civil Engineering has been awarded a £1m contract to demolish and reconstruct a bridge over Oak Beck which forms part of the A59 in Harrogate.

The bridge is heavily used by traffic, thanks in part to high volumes of traffic visiting the Oak Beck retail park, and is in a deteriorating condition.

Howard Civil Engineering will be undertaking works to demolish the existing bridge on Skipton Road and then design and build a replacement bridge.

Access over the bridge will be maintained throughout the project, with the exception of night works for surfacing.

gray-bg

SCOPE OF WORK

Site clearance

Site clearance and removal of existing trees and vegetation

Existing bridge structure

Removal and demolition of existing bridge structure ensuring it is temporarily supported when phasing the works

Foundation

Installation of a piled foundation solution with heavily reinforced pile caps to transfer the loads

Reinforced concrete wingwalls

Construction of reinforced concrete wingwalls and training walls

Reinforced concrete bridge deck

Construction of reinforced concrete bridge deck including specialist waterproofing works

Masonry and stone works

Masonry and stone works to clad the structure and form the parapets

Highway construction

Highway construction including kerbing, traffic signs and surfacing works