KING EDWIN PARK

BACKGROUND

Howard Civil Engineering commenced work at this site off Penny Pot Lane for Persimmon Homes in July 2018.

King Edwin Park is a development of apartments and 2-5 -bedroom homes situated within Harrogate. The works awarded to Howard Civil Engineering include the widening of Penny Pot Lane, introducing a new filter lane into the site. The site surface water outfall connection is to be installed within the existing Penny Pot Lane (under a road closure due to the width of the road), out-falling into a surface water course.

Work commenced on site with the creation of a temporary site entrance. The road and sewers package followed including 5m deep 1800mm dia attenuation pipes outfalling into a pond attenuation. The S278 works commenced in October.

gray-bg

SCOPE OF WORK

Infrastructure

Provision of adopted infrastructure for a 233-plot scheme in Harrogate

Filter lane and traffic islands

Provision of S278 works additional filter lane and traffic islands on Penny Pot Lane

Temporary traffic signals and road closures

TTRO applications for speed limit reductions, temporary traffic signals and road closures

Minimise disruption to Harrogate traffic

Liaison with North Yorkshire County Council and adjacent developers and utility providers to minimise disruption to Harrogate traffic

Drainage

2900m surface water and foul water 150mm dia to 2100mm dia drainage up to 5m deep

Pumping station

Adopted foul water 6m deep pumping station

Carriageway

Installation of carriageway to base course

Drainage installed within Penny Pot Lane

500m surface water drainage installed within Penny Pot Lane under road closure and connection to existing surface water watercourse

Shallow high pressure gas

Shallow high pressure gas main stretches diagonally across site