CASE STUDY

HARLOW HILL GRANGE

Harlow Hill Grange is development of two, three and four bedroom homes situated within walking distance of Harrogate town centre.

CLIENT: CADDICK CONSTRUCTION

VALUE:

£4M

LOCATION:

YORK

CONTRACT PERIOD:

40 WEEKS

CONTRACT TYPE:

JCT DOM 1

logo
CASE
STUDY

HARLOW HILL
GRANGE

HARLOW HILL GRANGE

BACKGROUND

Harlow Hill Grange is development of two, three and four bedroom homes situated within walking distance of Harrogate town centre.

The works awarded to Howard Civil Engineering include the widening of Otley Road, introducing a new filter lane into the site, and the provision of a 250m long, 3m wide cycle lane and footpath towards Harrogate. The site foul rising main was installed within the existing Otley Road outfalling into an existing manhole situated in the middle of a live junction 560m from the site.

Work commenced on site with a road and sewers package including a 6m deep foul and surface water pumping station and surface water attenuation tank.

gray-bg

SCOPE OF WORK

Infrastructure

Provision of adopted infrastructure for a 122 plot scheme in Harrogate

S278 works

Provision of S278 works additional filter lane and traffic islands on Otley Road

S106 agreement

250m cycle path S106 agreement

TTRO applications

TTRO applications for speed limit reductions and temporary traffic signals

Minimise disruption to Harrogate traffic

Liaison with North Yorkshire Country Council and adjacent developers and utility providers to minimise disruption to Harrogate traffic

Drainage

850m surface water and foul water 150mm dia to 1500mm dia drainage up to 4m deep

Pumping station

Adopted urface water and foul water 6m pumping station.

Carriageway

Installation of carriageway to base course.

Foul water rising main

560m foul water rising main installed within Otley Road under temporary traffic signals including connection to existing foul water manhole centred in busy junction

TRUST US TO DELIVER YOUR PROJECT ON TIME AND ON BUDGET