CASE STUDY
HARLOW HILL GRANGE
Harlow Hill Grange is development of two, three and four bedroom homes situated within walking distance of Harrogate town centre.
CLIENT: CADDICK CONSTRUCTION
VALUE:
£4M
LOCATION:
YORK
CONTRACT PERIOD:
40 WEEKS
CONTRACT TYPE:
JCT DOM 1
HARLOW HILL GRANGE
BACKGROUND
Harlow Hill Grange is development of two, three and four bedroom homes situated within walking distance of Harrogate town centre.
The works awarded to Howard Civil Engineering include the widening of Otley Road, introducing a new filter lane into the site, and the provision of a 250m long, 3m wide cycle lane and footpath towards Harrogate. The site foul rising main was installed within the existing Otley Road outfalling into an existing manhole situated in the middle of a live junction 560m from the site.
Work commenced on site with a road and sewers package including a 6m deep foul and surface water pumping station and surface water attenuation tank.
SCOPE OF WORK