CASE STUDY

CALDER MEWS

Calder Mews is a collection of brand-new homes being constructed by Yorkshire housebuilder and Howard Civil Engineering’s longstanding client, Erris Homes.

CLIENT: ERRIS HOMES

VALUE:

£1.2M

LOCATION:

HALIFAX

CONTRACT PERIOD:

12 WEEKS

logo

CALDER MEWS

BACKGROUND

Calder Mews is a collection of brand-new homes being constructed by Yorkshire housebuilder and Howard Civil Engineering’s longstanding client, Erris Homes.

This site is topographically challenging, with many of the homes being split level to accommodate the hilly nature of the development.

Set back from a main road into the centre of Greetland, Halifax, this project requires utmost sensitivity to local traffic and nearby residents, including a care home which sits alongside the site.

Howard Civil Engineering is delivering the roads and sewers package on this development.

gray-bg

SCOPE OF WORK

Attenuation Tank

182m³ L-shaped attenuation tank designed to suit the site layout.

Drainage

750m of drainage across the site.

Long Highway Retaining Wall

42m-long highway retaining wall which reaches almost 4m in height.