CASE STUDY
A1L2B DRAINAGE
The A1 Leeming to Barton upgrade replaced the existing dual carriageway with a new three lane motorway. It also included the provision of a new local access road alongside the new motorway, a new grade separated junction at Catterick, and an improved junction at Scotch Corner to provide access to the strategic road network.

CLIENT: WILLMOTT DIXON
VALUE:
£1.5M
LOCATION:
NORTH YORKSHIRE
CONTRACT PERIOD:
48 WEEKS
CONTRACT
TYPE:
NEC3 SUBCONTRACT OPTION B

STUDY
A1L2B
DRAINAGE
A1L2B DRAINAGE
BACKGROUND
The A1 Leeming to Barton upgrade replaced the existing dual carriageway with a new three lane motorway. It also included the provision of a new local access road alongside the new motorway, a new grade separated junction at Catterick, and an improved junction at Scotch Corner to provide access to the strategic road network.
The 12-mile section of the A1 between Leeming and Barton carries between 59,000 to 69,000 vehicles per day, and previously had poor alignment with many side road junctions, and farms and field accesses.
Howard Civil Engineering was awarded the drainage works to four of the outfalls of the scheme, with further outfalls released as work commenced on-site.

SCOPE OF WORK
Overview
Over 12,000m surface and combined water drainage ranging from 300mm dia to 900mm dia
French and filter drain
Over 11,000m of french and filter drain
Rising main
Over 900m rising main 150mm dia to 300mm dia
Manholes and catchpits
Over 500no. manholes and catchpits up to 2100mm dia and 3.5m deep
Video
FEATURED CASE STUDIES


TRUST US TO DELIVER YOUR PROJECT ON TIME AND ON BUDGET