Scarborough Hospital

Client: Integrated Health Projects

Value: £5m
Location: Scarborough
Contract Period: 50 weeks
Contract Type:

Background

A £47m contract to improve Scarborough Hospital is being undertaken by Integrated Health Projects, a joint venture between Sir Robert McAlpine and VINCI Construction.

The overall project includes the construction of a new two-storey building, which will combine and expand the existing Accident and Emergency department and acute medical unit, and the improvement of site-wide infrastructure such as the electrical systems, ventilation, and drainage.

This is the largest capital scheme ever undertaken by York and Scarborough Hospitals NHS Foundation Trust.

Following our recent improvement works at Huddersfield Royal Infirmary for VINCI, Howard Civil Engineering was approached by Integrated Health Projects to support them on this new project.

Due to the location of this project, we are looking forward to employing primarily local subcontractors and suppliers whilst undertaking work at Scarborough Hospital.

Howard Civil Engineering procured this project via the ProCure22 Framework.

A virtual tour of the new two-storey building can be taken here.

Scope of works

  • Enabling works including service diversions
  • Relocation of existing helipad
  • Working in a live hospital environment, maintaining access for pedestrians and vehicles and avoiding existing services
  • Installation of new surface and foul water drainage to service the new extension including two large geo-cellular attenuation tanks
  • Installation of pile caps and ground beams to the new hospital extension
  • Construction of three-storey reinforced concrete frame extension for a new Accident and Emergency ward
  • Construction of two lift and stair cores with extensive temporary works requirements
  • Installation of new car park to enable Integrated Health Projects' site compound and setup
  • Over 4000m³ of concrete in the foundations and frame
  • 800 tonnes of reinforcement will be installed in the foundations and frame
  • Installation of 1600m of drainage up to 5m deep
  • Installation of 1000m of service ducting
  • Over 2000m of kerbing to be installed

Praise from our stakeholders

"While Howard [Civil Engineering] has been on site, the team has been extremely proactive, and the site manager (Patrick Furlong) has been excellent. With this in mind, I would definitely use Howard Civil Engineering on other projects."

- Gary Connor, Senior Construction Manager at VINCI Construction