This project was part of a major mixed-use new-build development. The second phase comprised two blocks of student accomodation sitting on the south edge of a new public square formed from the new stopped up Boston Street and provides commercial, restaurant and business premises as well as 182 student rooms and a basement car park.
Howard Civil Engineering was awarded the basement construction which included the pile caps, capping beam and groundbeams as well as the perimeter wall and base and ground floor slabs of the basement car park.