We've nearly completed our RC Frame for Wates for Leeds City College. These drone shots provide us with a unique prospective of the quality product we have delivered.
The footprint, existing topography and city centre location made this a challenging build which was off set by the advance logistical planning undertaken by Howard Civil Engineering prior to being awarded the scheme.
The works commenced in July 2017 with the groundworks package.
In brief the substructure consists of a 3500m2 basement with foundations, drainage, retaining walls, earthworks and vertical columns and cores.
The superstructure involved the construction of 6no blocks up to 8 stories high.