The Phoenix Project

Client: ISG Regional

Value: £2.7 million
Location: Leeds
Contract Period: 35 weeks
Contract Type: Bespoke

Background:

Following extensive negotiation and Value Engineering Sessions, Howard Civil Engineering were awarded the groundworks and structures package for the £20million project to build TPP’s new head office in Horsforth, Leeds.

The project sees ISG construct an 85,000 sq ft head office building for TPP on a sloping site, which incorporates two levels of under croft car parking facilities.

A key feature of the new building is the virtual absence of columns across the four main floor plates, with ISG installing a series of delta beams which span up to 17m within the main office areas to provide uninterrupted sight lines from front to rear. At ground floor level, TPP’s new headquarters will boast a high specification main reception area with a double height, light filled atrium, and a combination of cellular and open plan office accommodation to the rear of the building.

The project represents Howards first project in Partnership with ISG

Scope Of Works:

  • Planning and Administration – High Intensity Planning and Programming exercise required to a restricted and challenging site.
  • CE and Groundwork’s – Extensive Excavation and Mass filling Operations, in very pour ground conditions, in advance of the main Basement Construction.
  • RC Works – The Construction of an awkward shaped two storey underground Car park, consisting of RC Retaining wall bases with Walls Stems 6.0m in height. A 2.0m deep single central core foundation with 700m3 on concrete was constructed incorporating a tower crane base. RC Ground Bearing Floor slabs were constructed at basement level.
  • External Works – Kerbing, Paving and  Block paving to external Pedestrian areas.
  • Drainage – YWA Sewer Diversions in advance of main Project commencement; Installation of Tubosider Surface Water Attenuation Tank; Internal and External Drainage Installation
  • Highways and Surfacing – Access Road and Car Park  sub-base build up and Tarmac Surfacing.

Testimonial

“Neither ISG or I had worked with Howard’s before this venture , but I feel our leap of faith has been rewarded. The job at TPP has been managed very well and programme dates have been carefully managed between both parties throughout, the quality of their work coupled with their excellent safety standards make them an outstanding partner” 

Anthony Mitchell, Project Manager, ISG