Sheffield Children’s Hospital

Client: Balfour Beatty

Value: £555,000
Location: Sheffield
Contract Period: 22 weeks
Contract Type: Bespoke

Background:

Balfour Beatty were awarded the Sheffield Children’s hospital as part of the Procure 21 framework. Due to the complexities of the project Howard Civil Engineering were heavily involved throughout the life of the tender in order to identify build efficiencies and also to hit programme and cost targets.

The project will add two theatres and additional bed spaces for sick children who can travel from all across Yorkshire and surrounding areas.

The contract value was just over £8million and was completed in 2014

Scope Of Works:

  • Concrete Framed Structure for an extension to a hospital within a very restricted site footprint, surrounded on three sides by buildings and a road on the remaining elevation.
  • Heavily Involved at Tender and Post award in the Planning and Temporary works schemes to facilitate the Construction of this awkward building
  • Extensive Underpinning Operations to existing structures.
  • Contiguous Piled walls and Capping Beams to two elevations.
  • Adoptable Main Sewer diversion through the middle of the structure.
  • Basement Reduce Level operation to the whole of the site footprint.
  • RC Raft Construction to Basement slab.
  • Fully Tanked Basement Construction
  • One Sided RC Retaining Walls to Basement.
  • RC Shear Walls and Columns
  • Two Storeys of RC Suspended Slab Superstructure.
  • Upper Floors Holorib Floor Construction
     

Accreditations

Trust us to deliver your project on time and on budget