Background

Howard Civil Engineering were pleased to support Henry Boot in the delivery of this unique highly specified project; an extension to one of the North’s leading hotels.
The works consisted of the construction of a new spa and hotel extension to the Grade 1 listed historic Rudding Park Hotel nestled within an 18th century Repton landscape.
Green roofs, green walls and roof gardens all formed an integral part of the landscape scheme to preserve the integrity of the historic landscape yet satisfy the commercial aspirations of the proposals
The new spa, featuring a 17m swimming pool, hydrotherapy pool, thermal rooms, treatment rooms, an additional restaurant and shops, will take an overall 14 months to build.
The swimming pool area will boast a glass wall to take in the views of the rolling countryside surrounding the hotel.

Prior to award the Client paid several visits to our Yeadon site, another RC frame for Henry Boot, to assure himself that he had choosen the right partners for this prestigious project.

Scope of Works

  • A surprisingly complex building on 3 levels with multiple split levels to incorporate the 2 pools and associated plant and equipment.
  • Early Contractor Involvement – Howard supported Henry Boot at tender stage to develop the programme to take consideration of the multiple split levels and the detail incorporated into the RC design to facilitate the mechanical installations, waterproofing and further precast concrete sections
  • Extensive falsework design to form split level soffits above split level floor slabs.
  • Existing hotel and estate wide facilities to remain fully operational throughout the duration of the project which constrained the choice of crane which had to be lowered out of sight during planned events, wedding etc.
  • Bulk phased excavation to form the basement and swimming pools at various levels
  • Basement foundations, slabs, walls, columns, reinforced concrete frame approx 2,000m3 reinforced concrete built over 3 split levels
  • Welded membrane waterproofing to pool structures
     

Accreditations