Princeville Primary School

Client: Willmott Dixon

Value: £525,000
Location: Bradford
Contract Period: 41 weeks
Contract Type: Bespoke subcontract

Background:

Howard Civil Engineering successfully carried out the ground works to thie Primary School extension which was complated in January 2015

Using a Sunesis Keynes (pre-designed school) model Wilmott Dixon delivered this two storey expansion to an existing primary school in Bradford through the Yorbuild Framework in just 41 weeks. The 3,800m2 building adjoined an existing single storey school which was live throughout the period of construction.

The proimity of the 'live' school required carful planning in order to minimize distrubtion to the pupils education.

Scope Of Works:

  • Trench Fill Foundations.
  • Suspended Ground Slab/Raft
  • Attenuation Tanks  
  • Drainage and External Works Package

Accreditations