This build is part of a major mixed-use new-build development, the first phase of which was completed last summer. Phase Two comprises two blocks of student accomodation sitting on the south edge of a new public square formed from the new stopped up Boston Street and will provide commercial, restaurant and business premises as well as 182 student rooms and a basement car park.
Howard Civil Engineering were awarded the basement construction which includes the pile caps, capping beam and groundbeams as well as the perimeter wall and base and ground floor slabs of the basement car park.
Looking good! We were honoured to supply the basement #construction including pile caps, capping beam and groundbeams in addition to the perimeter wall and base and ground floor slabs of the basement car park. Read more: https://t.co/FTn1LIRyz1 @bandkbuild https://t.co/iVbuNCspQq — Howard Civil Eng (@HowardCivilEng) February 5, 2020
Looking good! We were honoured to supply the basement #construction including pile caps, capping beam and groundbeams in addition to the perimeter wall and base and ground floor slabs of the basement car park. Read more: https://t.co/FTn1LIRyz1 @bandkbuild https://t.co/iVbuNCspQq
0.3%
AFR in October 2020
0.5%
IFR in October 2020
836,000
hours since last reportable incident
100%
of our engineers have HNC qualifications
of our managers have a minimum of 5 day SMSTS training