Harworth Roof Tile Factory

Client: Persimmon Homes

Value: £3.6 million
Location: Doncaster
Contract Period: Commenced September 2018
Contract Type: Persimmon Bespoke

Background

Persimmon Homes' roof tile factory provides the tiles for their standard range of homes and sits alongside their brick factory, a scheme which was also completed by Howard Civil Engineering.

Our package of works consisted of the specialist machine foundations, foundations and slabs for the various portal frame buildings, the roads and sewers, and the external yards.

Scope of works

Working to a tight programme to meet portal frame and mechanical installations all civils works required for the following

  • Tile manufacturing building and office substructures
  • Internal concrete floors including tile factory upper floor
  • 500m³ reinforced concrete external machine foundations
  • 150mm-600mm diameter surface and foul water drainage
  • 710m³ cellular storage tank
  • 4 bypass separators
  • Over 10,000m² external slabs
  • 2,000m² associated parking, highway and footpaths around the site.