Harworth Brick Factory

Client: Persimmon Homes

Value: £1,500,000
Location: Doncaster
Contract Period: 6 months
Contract Type: Persimmon Bespoke contract

Background

Work is well under way on our third project for Persimmon Homes. This time for their new brick factory; a flagship project for the group on a 14.76 acre site in Harworth, South Yorkshire.

 Our package of works contains the Specialist Machine Foundations, foundations and slabs for the various portal frame buildings, the roads and sewers including off site connections and the external yards.

Scope

Working to a tight programme to meet portal frame and mechanical installations all civils works required for the following

  • Brick Manufacturing Building
  • Curing chamber annexed to above.
  • Internal Factory Process plant and machinery.
  • External Sand Bins, Hoppers, Mixing and Batching, Cement Silos and associated conveyors.
  • Suitable delivery, drop off, loading areas.
  • Plant manoeuvring areas for scooper and hopper areas.
  • Storage area for finished product.
  • Loading area.
  • Temporary Office Buildings
  • Fuelling and Maintenance Building
  • Separate fuelling and maintenance area for the continued operation of fork lift trucks.
  • Associated roads and footpaths around site along with two weighbidges.
  • Surface and foul water infrastructure including off site connections

In preparation to receive German manufactured plant and equipment, tolerances of <2mm have been specified for many of the bases, plinths and floor slabs.

Accreditations

Trust us to deliver your project on time and on budget