Howard Civil Engineering was appointed due to our experience in the manufacturing sector and our ability to work to challenging timeframes and completing projects on time and on budget. The site location pushed our limits with regards to distance from our head office in Leeds, but proved the ability of our management team in the successfully delivery of this flagship contract.
Through successful partnering workshops with our client, we made allowance for co-ordinating the installation of our works with those others on site, working closely with other subcontractors to the main contract carrying out works such as structural steel work, composite cladding, external walls and roofing, curtain walling, tarmacadam works and electrical, mechanical and process equipment installation. Adhering to the tight handover dates ensured the scheme was delivered to programme.
90.75%
average Health and Safety score in 2022
100%
of our managers have a minimum of 5 day SMSTS training
of our engineers have HNC qualifications
83
days volunteered in 2022